Case Study #1
Supply Issue
Customer: Major Tier 1 Supplier to Asian OEM
Application: Interior IP – Radio Bezel, Dials and Knobs
Material: Smoke PC – Color Matched
Process: Painted and Laser Etched
Timeline: 4 Weeks
- Jenerxx visited Asian OEM – Identified areas for us to assist
- Tier Customer had issues with supply of material from major resin manufacturer
- Benchmarked Incumbent Material
- Provided sample material 1 week
- Process trial + process engineer – Mold / Dimensional / Color Conformation / Paint Adhesion / Laser Etch Trails
- Created and Obtained Asian OEM Approvals
- Share Shift – Production Ramp Up and Stable Production Achieved
Case Study #2
Cost Challenge
Customer: Tier 1 Supplier for US OEM
Application: SUV Wheel Liner
Material: TPO Black -30 ductility requirement – 2.5m lbs.
Process: Injection Mold Thin Wall Application
Timeline: 3 Months
Cost Savings: $350k
- Tier 1 Customer contacted Jenerxx Team – program upside down.
- Provided Solution and Cost – 48 hrs.
- Sample Material Provided – 2 wks.
- Process trial + process engineer: Mold, dimensional, multi axial ductility test
- Jenerxx team worked with US OEM / Tier1 for Material Approvals
- OEM Plant trials at all facilities – 3 facilities
- Share Shift – Production Ramp Up and Stable Production Achieved
Case Study #3
Cost Challenge
Customer: Tier 1 Supplier for US OEM
Application: Cowl Screen
Material: 10% Talc Filled Copolymer PP, Color Match, UV
Process: Injection Mold
Timeline: 6 Months
Cost Savings: $160k (2,000,000Lbs)
- Tier 1 Customer contacted Jenerxx Team – One OEM Approved Source
- Sample Material Provided – 2 wks.
- Process trial + Process engineer: Mold, Dimensional, Color match, 3500Hr Xenon Arc UV Testing
- Jenerxx team worked with US OEM / Tier1 for Material Approval
- Share Shift – Production Ramp Up and Stable Production Achieved
Case Study #4
Technical Challenge
Customer: Major Tier 1 Supplier to European OEM
Application: HVAC
Material: 20% Talc Filled Homo Polymer
Technical Challenge: New Odor and Emissions Requirements after Long-Term 700hours @ 150c.
Only 1 approved source at European OEM in NA
Process: Mold, Dimensional, Assembly
MET SPECIFICATIONS and obtained cost savings
- OBJECTIVE – Developed NEW ADDITIVE PACKAGE for standard material as alternate source approval
- Tested and Passed
- Obtained joint approval with European OEM and Tier 1
- Production Ramp Up and Stable Production Achieved